In numbers
The problem
Clients filled temporary shifts by calling several labour hire agencies and repeating the same details. Agencies re-keyed requests from emails, and timesheet approval meant chasing managers for signatures. Colleago connects all three sides: clients on a web portal, agencies on an admin portal and temps on a mobile app. I designed the client portal, where every request starts; testing so far has been with hospital client managers.
- The first eligible temp to accept gets the shift, so every hour a request sits in an inbox matters.
- Nurse unit managers approve 20 to 40 agency timesheets a week, often in one sitting before the payroll cut-off.
“This is the bit that used to take my Monday morning.”
One place for clients to request shifts and approve timesheets, so agencies don't copy and paste and clients don't chase agencies.
How I work on it
I first worked on Colleago in 2020, when it was a startup. Now it's scaling, and still changing every week.
Map both client journeys into the PRD
Creating a request and approving a timesheet, from the gap on the roster to the temp getting paid. The journeys fed the client portal v2 PRD, owned by the PO and the source of truth for scope.
WithPODesigners
Create a work request: 9 steps, 3 of them uncertain in testing. Approve a timesheet: from the temp's phone to the agency's billing.
Design the client portal
From the dashboard to sending a request. The example here is a school's account.
WithDesignersPO
Test, then turn findings into change requests
Three rounds of moderated think-aloud sessions, July to September, with client managers and agency admins on the live product. Findings became 12 change requests with evidence, priority and status; I checked them against the PRD with Claude, and two needed a PO decision.
WithClient managersAgency adminsPO
Session notes: task results, timestamped observations and follow-up actions. Consolidated feedback, updated weekly while round 3 synthesis continues.
Design in code, through pull requests
Some components live in Figma and some only in the repo. I start from the source of truth, branch from main, change it with Claude Code and open a pull request that explains what changed, what each reviewer should check and what's left out.
WithDesignersEngineering
How three designers ship changes in one repo. A round 3 PR: five change requests, with reviewers and tests listed.
What testing is changing
Timesheet approval is close to target. Creating a request is where the friction sits.
- Templates and repeat requests weren't found4 of 9 peopleIn progressRecent requests and templates shown first, and a Duplicate action on every request.
I didn't even see that, I just saw the hospitals.
- The second schedule block was misunderstood6 of 9 peopleIn reviewRenamed to “Add another shift pattern”, with a shift count on each block.
- Unsure which agency receives the request4 of 9 peopleDoneThe agency is named on the send button and in the confirmation.
Which agency? We use two.
- No rostered vs actual comparison6 of 9 peopleIn progressRostered and submitted hours side by side, with variances highlighted.
A mistake that changed how we ship
Early on, design changes skipped review. A branch I cut from an older version overwrote another designer's component update, and we only noticed once it was live.
- Branch from the latest main every time, one change request per branch
- No merge without a pull request and two approvals: a designer and a developer
- Every PR carries a written summary, so the whole team knows what changed
With three designers in one repo, the process is part of the design.
Working with stakeholders
Three designers, a PO, an engineering squad and 22 agencies relying on one product while testing runs.
Who I worked with, and on what
Blockers, and how I moved them
- Who owns the shift rate: the client or the agency?Rates come from the agency contract, so I'm designing a read-only rate with a “request a different rate” note.
- Should clients approve timesheets from email?Parked for a security review. Meanwhile, a deep link returns to the exact timesheet after sign-in.
- Four managers asked to approve on their phoneRaised as a scope question for v2, with the evidence from testing.
What we're aiming for
The success measures in the PRD, and where we are:
Of the 12 change requests: 4 done, 2 in review, 3 in progress, 1 waiting on a decision and 2 in the backlog.
Reflection
I first worked on Colleago in 2020, when it was a startup. Coming back to it now, the biggest change for me is working in one codebase with two other designers, and thinking about how a change reaches production, not just how it looks.